Skip To Content

Menu

Better Roads Davenport

Change is happening. Bear with us!

Street and sewer improvements can lead to inevitable slowdowns and traffic reroutes. We ask that you keep your eye on the prize: a city with enhanced livability that can support existing business infrastructure as well as attract new companies. It’s a short-term hassle with long-term payoffs.

As always, safety is our number one priority. Staying calm and following construction zone signage will help us achieve that.

As we work to modernize the sewer and street infrastructure to support growth and a vibrant future for our community, remember: there are better roads ahead, Davenport!

Picture of sign with words Road Work Ahead

Current Traffic Updates

This Just In

  • Beginning Monday, June 3, Main St will be closed between Locust Street and Palmer for resurfacing, installation of new curbs and gutters, and ADA sidewalk improvements. During construction, access to locations east and west of Main Street will be available via either Harrison or Brady Street. No traffic will be allowed on Main Street to ensure the safety and efficiency of the work and construction zone.  The project is estimated to be complete by the end of September. 
  • Watch for transitioning traffic control on 3rd St between Telegraph and Howell over the next few weeks. One lane of travel will remain open as crews begin applying asphalt in the southern lanes next week. Work will transition from the southern lanes to the northern lanes as the leveling base is applied, followed by the final surface layer across all lanes. Once the final surface layer and concrete boxouts are complete, work will transition to the next section of 3rd St between Howell and Marquette.
  • E 36th St closed between Brady and Kimberly Rd for private utility disconnections. The road is estimated to re-open by July 10.
  • Utica Ridge Rd will be down to one alternating lane of travel between 58th and 62nd St during the daytime beginning June 2, for utility pole replacement by MidAmerican Energy. Work is estimated to be complete by June 6. Delays are possible. All lanes of travel will be open during non-working hours. 
  • Iowa American has various water main and hydrant work happening across the City including14th and Spring, 5th and Cedar, 13th and Ripley, 10th and Sylvan, River Dr and Blue Grass Ct, and Telegraph and 6th. 
Neighborhood Streets
 
  • Newberry St between Pine and Lincoln Ct is set to see water main installation followed by resurfacing starting June 2. One lane of travel will be maintained during construction. Work is estimated to be complete by the end of August. 
  • Resurfacing on Indian Rd between May and Concord began earlier this week. One lane of travel will be maintained during construction. Work is estimated to be complete by mid-July.

Major Projects

Closures for Special Events

All Other Street Closures & Lane Reductions (List)

Image of Alert Iowa Banner

Sign-up for Alerts and Report a Pothole

Sign-up for Notices

  • Text betterroads to 672-83 to receive notices about changes in significant construction projects.
  • Sign-up for text, e-mail and/or phone notifications about significant construction projects and other news and notices such as our weekly edition of This Week's Commute, Snow Emergency Declarations, Flood Updates and more. 

Report a Pothole by:

  • Submitting your request on-line our using the SeeClickFix app (download from Google Play or the App Store), or
  • Calling us at 563.326.7923, 7 AM to 4:30 PM, Monday through Friday (except holidays)


Picture of slide and walking path in park

Park Access Impacted by Construction

  • 05.16.25 | Great news! The Flood Resilience Project between 3rd and Tremont and along the riverfront is nearly complete! The Riverfront Recreational Trail has re-opened! Grading and other finish work will continue through early June before things fully wrap up.

  • 04.25.25 | The city's multimodal transportation network will see expansion with the addition of the West Loop trail soon. Find details at this link.

  • 04.04.25 | Use this link for information on the closures of the Riverfront Walk and Riverfront Recreational Trail near the Main Street Landing Project.

  • 04.04.25 | Beginning Monday, April 7, the Iowa DOT will begin bridge rehabilitation work on the Harrison St Bridge over Duck Creek.  Work will start with the installation of a temporary connection to the Duck Creek Recreational Trail.  The Duck Creek Recreational Trail will then be closed under the bridge, and will be rerouted across Harrison St with the use of a temporary pedestrian signal.  Rehabilitation work will reduce travel to two lanes between W 35th and W 32nd Streets. The Iowa DOT estimates work will be complete in November.   

  • 05.09.25 | Work on the Duck Creek Sewer Interceptor adjacent to and along the Duck Creek Recreational Trail is progressing steadily. Construction of the interceptor between Hickory Grove Rd past Fairmount is expected to be complete by mid-June. The contractor will then reinstall trail locations that were removed or damaged during construction before re-opening the trail. Pending weather and rail coordination, the entire Duck Creek Recreational Trail should be re-opened by the end of June/early July.

  • 03.17.25 | Watch for updates this fall when the remaining phase of the Goose Creek Connector Trail and Veterans Memorial Parkway Connector Trail are complete.


Image of construction worker with BRAD acronym

BRAD | Better Roads Ahead Davenport

Meet BRAD. He is all about Better Roads Ahead for Davenport, and helping to reduce frustration when building better roads disrupts travel routes.  Find out when BRAD’s work might impact a major road near you by texting BetterRoads to 69310 or using this website, www.betterroadsdavenport.com, for more details and other resources.

Picture of a white truck

For Contractors

Contractors, or their designee, must submit an application to close a road or reduce travel lanes in the right-of-way at least three business days in advance of the closure unless emergency conditions exist.  Work cannot commence until the application is approved. 

Submit an application at this link.



image of female professional with GIA acronym

GIA | Great Infrastructure Ahead

Meet GIA.  She is all about planning for the future of our community. While BRAD will help keep you informed of current construction, GIA is navigating codes, design and budgets. Look for GIA and Great Infrastructure Ahead announcements as City Council approves budgets and designs for projects coming down the pipe.

Contact

Davenport Public Works
1200 E 46th St, Davenport, IA
Davenport, IA 52807
Phone:
563.326.7923
Email: