
Resurfacing of W Locust Street between Division and Marquette Streets will begin on September 5 in the eastbound lanes. One lane of travel will be open in each direction. Delays are to be expected. Signals at Marquette and Division will have timing changes to help move traffic, and the Washington signals will be set to flashing and are to be treated as a 4-way stop. North/south travel will only be allowed at Marquette, Washington, and Division; all other streets and alleys will be closed south of Locust. Watch for changing traffic control as work progresses.
The project will include some stormwater system and ADA ramp updates at the intersecting side streets along the stretch.
All work is expected to be complete by early to mid-December.